More than 30 bridges, two pylons and a telecom mast inspected in three campaigns, with studies to upgrade the restraint systems.
THEOREMS has been working with ALIS on the A28 motorway since 2021. In 2021, three standard structures underwent a full diagnosis and studies to upgrade their restraint systems. In 2023, ten bridges, two pylons and a telecom mast were inspected. In 2026, nineteen bridges.
The structures are reinforced or prestressed concrete slab bridges, a railway bridge, culverts and hydraulic structures.
Services provided
- Review of the archives and original design
- Detailed inspections and multi-criteria diagnosis
- Restraint system upgrade solutions and outline drawings











