THEOREMS
  • Home
  • About
  • Services
    • Design and project management
    • Diagnosis and repairs
    • Construction design
    • Complex structural analysis
    • Detailed inspections
    • Abnormal loads
    • Software development
  • Sectors
    • Infrastructure and bridges
    • Civil engineering and buildings
  • Projects
  • News
    • Press coverage
    • The great builders
  • Tools
    • Section properties
    • Beam calculator
    • Slab calculator
    • Load combinations
    • Calculation sheets
    • Catalogues
    • Strength of materials handbook
  • Contact
    • Write to us
    • Tell us about a tender
    • Propose a collaboration
    • Request a quote
    • Abnormal load preliminary study
    • Book a meeting

Select your language

  • Français
  • English
  1. Home
  2. Projects

Projects

A selection of projects carried out by THEOREMS since 2014 for departmental councils, inter-municipal bodies, motorway companies, the State and industry: design and project management, rehabilitation, diagnosis, reassessment and abnormal loads. Filter by service, type of structure or client, or display the map.

Service

65 projects

  • ProjectLocationClientPeriodScope of workConstruction cost
  • Ongoing A64 and A66 motorways: refurbishment of bridges Réseau ASF ASF (VINCI Autoroutes) Studies for rehabilitation, full design and project management Two prestressed slab overbridges: waterproofing, joints, concrete, drainage and bearings.
  • Ongoing Conversion of the Tranchasse canal bridge into a cycle route Colombiers et Ainay-le-Vieil (18) Berry Canal Syndicate DIA, AVP, PRO Listed canal bridge over the Cher, converted for “le canal de Berry à vélo” cycle route.
  • A28 motorway: detailed inspections and diagnosis for ALIS Autoroute A28, entre Rouen et Alençon ALIS Detailed inspection, diagnosis, upgrading of restraint systems More than 30 bridges, two pylons and a telecom mast inspected in three campaigns, with studies to upgrade the restraint systems.
  • Abnormal load route in Lozère: 123 structures assessed Pied-de-Borne et Villefort (48) EDF (applicant) – structures of the Lozère Departmental Council DIA, reassessment, investigations Survey, inspection, reassessment and monitoring of 93 walls, 29 bridges and a gallery for 157 t convoys to the Pied-de-Borne power station.
  • Eurovélo 5 footbridge over the route de La Bassée Lens (62) Conurbation of Lens-Liévin Structural design, full design and project management 43 m weathering steel box-girder footbridge for the Eurovélo 5 cycle route, designed with finite element analysis and founded on micropiles.
  • Reconstruction of the Rametz bridge over the Hogneau Bavay (59) Nord Departmental Council DIA, AVP, PRO, ACT, VISA, OPC, DET, AOR, Water Act application Brick arch replaced by a reinforced concrete arch, restoring the ecological continuity of the Hogneau.
  • A62 and A10 motorways: replacement of joints and bearings Réseau ASF ASF (VINCI Autoroutes) Structural design, full design and project management Two VIPP and PSDP structures: review of the structure files, reassessment of load paths and design of bearings.
  • Eure Departmental Council: detailed inspection of three structures Eure (27) Eure Departmental Council Detailed inspection, diagnosis A retaining wall, a slab bridge and a bridge over SNCF tracks inspected and diagnosed.
  • Ongoing Rehabilitation of the Ranville bridge over the Orne Ranville (14) Calvados Departmental Council DIAG, EP, AVP, PRO, DCE, ACT, VISA 82 m composite bridge in a marine environment: chloride and carbonation diagnosis, then design and project management of the full rehabilitation.
  • Ongoing Rehabilitation of the Colombelles bridge (VIPP) over the Orne Colombelles (14) Calvados Departmental Council DIAG, EP, AVP, PRO, DCE, ACT, VISA Three-span prestressed beam viaduct: design and project management of the rehabilitation, works planned for 2026.
  • Reconstruction of the Bateliers bridge over the Sambre Hautmont (59) Nord Departmental Council Full design and project management Replacement of a 1922 bridge by a deck of 15 PRAD prestressed beams spanning 25 m, with a 40 m temporary footbridge during the works.
  • Ongoing Rehabilitation of the Malraux viaduct in Poitiers Poitiers (86) Grand Poitiers Urban Community Full design and project management 323.50 m viaduct with post-tensioned prestressed beams over eight continuous spans: rehabilitation, works planned for 2026.
  • A1 and A26 motorways: refurbishment of 10 bridges Arras, Saint-Quentin, Hauts d’Artois SANEF Studies for réfection Restoration studies for ten standard structures (PIPBP, PIDP, PICF, PIPO, PSDP) on SANEF’s northern network.
  • Ongoing Strengthening of the Moeuvres bridge by external prestressing Moeuvres (59) – Graincourt-lès-Havrincourt (62) Nord Departmental Council Full design and project management 32.28 m VIPP over the Canal du Nord: additional external prestressing, composite strengthening and full rehabilitation.
  • Reconstruction of the Pipes bridge over the Cusancin Baume-les-Dames (25) Doubs Departmental Council Full design and project management, Water Act application, listed-site application Replacement of a masonry bridge by a 28 m filler-beam deck on micropiles within the existing abutments, in a listed site.
  • Pontoons and suspended footbridge under boulevard Schuman Arras (62) Arras Urban Community Design and project management Pontoons on piles and a footbridge suspended under the three boulevard Schuman bridges to cross the Scarpe at the Saint-Michel lock.
  • Reassessment and strengthening of the Montoussé bowstring bridge Montoussé (65) Hautes-Pyrénées Departmental Council Detailed reassessment, full design and project management 43.70 m concrete bowstring restricted to 3.5 t: reassessment, carbon fibre strengthening and general rehabilitation.
  • Ongoing Jacking and strengthening of a bridge over railway lines Le Val d’Hazey (27) Eure Departmental Council Design and project management 51 m multi-girder steel deck over the Paris–Rouen–Le Havre line: jacking, bearings, waterproofing, corrosion protection.
  • Rehabilitation of the Marigny-Chémereau bridge and addition of a footpath Marigny-Chémereau (86) Vienne Departmental Council DIA, AVP, PRO, ACT Five masonry arches over the Vonne: material investigations, relieving slab with cantilever and 1.40 m footway.
  • Montpellier Méditerranée Métropole: diagnosis of 60 bridges Montpellier (34) Montpellier Méditerranée Métropole Detailed inspection, diagnosis Two campaigns, 34 then 26 bridges: slab bridges, masonry, steel structures, culverts and hydraulic structures.
  • Load capacity of the Juvigny-sur-Seulles bridge Juvigny-sur-Seulles (14) Calvados Departmental Council DIA, reassessment 8.60 m semicircular arch checked under code loads, cranes and semi-trailers of up to 120 t: a reference for convoy requests.
  • Reconstruction of the bridge over the Solre Obrechies (59) Conurbation of Maubeuge-Val de Sambre Design and site supervision Demolition of a 12 m reinforced concrete bridge and construction of a 9-beam deck on 20 m micropiles.
  • A4 motorway: restoration of 22 bridges A4, entre Paris et Metz SANEF Studies for restauration et de mise aux normes 22 structures between PR 18 and PR 353: PRAD, PICF, PIPO, PSDP, ribbed slabs.
  • Diagnosis and testing of the Pont des Alliés Criquebeuf-sur-Seine (27) Seine-Eure Conurbation, with SAPN DIA, reassessment, investigations, load tests Reinforced concrete beam bridge checked for 45 t construction vehicles, with radar testing and topographic monitoring.
  • Diagnosis and rehabilitation of OA 5754 over the Saint-Quentin canal Les Rues-des-Vignes (59) Nord Departmental Council Diagnosis, load capacity, rehabilitation studies 41 m Daydé bridge from 1928: corrosion of chords, water ingress, tilted abutment, repairs designed.
  • Diagnosis of the Tosny footbridge Tosny (27) Seine-Eure Conurbation DIA, reassessment Warren truss footbridge over a branch of the Seine: insufficient capacity and closure requested.
  • Reconstruction of the bridge over the Nartuby Montferrat (83) Var Departmental Council Design project management, client advisory during works Better rebuilt than repaired: 13.05 m slab of precast beams on 22 m piles.
  • Review of the construction design of a rail bridge Saint-Denis-de-l’Hôtel (45) SYSTRA VISA 13.83 m clear span reinforced concrete box structure under the Orléans–Gien line, for the RD921 bypass.
  • RD642, Renescure bypass: six bridges Hazebrouck – Renescure (59) Nord Departmental Council Studies for définition Design of six prestressed slab overbridges, including a 100 m structure over the railway at Wallon-Cappel.
  • Colayrac bridge: expert appraisal before the crossing of 685 t convoys Colayrac-Saint-Cirq (47) Cour administrative d’appel de Bordeaux (expert appraisal) – SNCF and Departmental Council Diagnosis, reassessment, expert appraisal 23.37 m skew slab over the railway: court-appointed expert appraisal, modelling and strengthening study for the Golfech power station convoys.
  • Steel bridge D0430 over the Oise–Aisne canal Bray-en-Laonnois (02) Aisne Departmental Council Reassessment, residual load capacity, rehabilitation 41 m steel bridge from 1946 with joints perforated by corrosion: residual capacity and rehabilitation options.
  • Diagnosis of OA 6313 over the Haute-Colme canal Looberghe (59) Nord Departmental Council Diagnosis, reassessment, load tests Daydé bridge from 1928: well designed for its time, it is limited to 19 t once corrosion is taken into account, as the load tests confirm.
  • Replacement of the access bridge to the Acquigny leisure park Acquigny (27) Seine-Eure Conurbation AVP, PRO, EXE, ACT, DET, VISA, AOR, OPC Ageing structure over the Iton replaced by a prefabricated, wheelchair-accessible solution for the Onglais leisure park.
  • Noise barrier at Lens hospital Lens (62) Conurbation of Lens-Liévin AVP, PRO, DCE (foundations and structures) Absorbent wood-concrete barrier about 100 m long, on HEB160 posts founded on micropiles.
  • Diagnosis of the VDR22 footbridge Val-de-Reuil (27) Seine-Eure Conurbation DIA 1980s truss girder footbridge: condition survey and costing of corrosion protection works.
  • Demolition and reconstruction of the Brionne bridge over the Risle Brionne (27) Intercom Bernay Terres de Normandie AVP, Water Act application, PRO, DCE, VISA, DET, AOR 14.80 m reinforced concrete slab on 800 mm piles, with a temporary bridge to keep a business accessible.
  • Diagnosis of the steel bridge at the Acquigny leisure park Acquigny (27) Seine-Eure Conurbation DIA 1920s truss girder bridge over the Eure: condition survey before rehabilitation.
  • Steel bridge D0336 over the Saint-Quentin canal Viry-Noureuil (02) Aisne Departmental Council Reassessment, residual load capacity, rehabilitation 33 m steel bridge from 1925: residual capacity with corroded sections and rehabilitation options.
  • Steel bridge D0429 over the Oise–Aisne canal Moussy-Verneuil (02) Aisne Departmental Council Reassessment, residual load capacity, rehabilitation 39 m Pratt truss bridge from 1946: residual capacity and rehabilitation options.
  • Seine quays of Île Seguin: diagnosis and recommendations Boulogne-Billancourt (92) SPL Val de Seine Aménagement Diagnosis, recommended works One kilometre of quays with cracked copings: diagnosis and recommendations for rebuilding the walkways.
  • Reassessment of steel bridge D0390 over the Saint-Quentin canal Omissy (02) Aisne Departmental Council Reassessment, residual load capacity Heavily corroded 1925 steel bridge: residual load capacity by finite element analysis and weight restriction pending the works.
  • General rehabilitation of the Joubert bridge in Poitiers Poitiers (86) City of Poitiers Design and site supervision Listed seven-arch bridge: diagnosis, widening with cantilevers and viewing platforms, full rehabilitation.
  • Load capacity of 17 Aisne departmental bridges Aisne (02) Aisne Departmental Council Reassessment, load capacity (framework contract) Assessment campaign on 17 bridges, often steel and a century old: weight restrictions proposed and urgent works identified.
  • Rehabilitation of PI1107 over the RD630 Hordain (59) Conurbation of Porte du Hainaut Full design and project management 17.80 m PRAD bridge with tilted abutments and ballast walls bearing on the deck: ground anchors, bearings, waterproofing and superstructures.
  • Rehabilitation of PS 1.8 on the A139 motorway Oissel (76) SAPN (SANEF group) Design and project management 65 m prestressed slab overbridge built in 1968: waterproofing, cornices, dual-function parapets, joints.
  • Dunkirk Port: load capacity of three quays Dunkerque (59) Dunkirk Port DIAG, reassessment TMV, Grande-Synthe and Escaut quays checked for 330 to 439 t mobile cranes: elastoplastic and finite element models.
  • Arrats-Gimont community of municipalities: 67 bridges inspected, 3 rehabilitated Gimont (32) Community of municipalities of Arrats-Gimont Detailed inspection, diagnosis, design and project management Detailed inspection of the community’s bridge stock, then strengthening of the structures at risk, including a broken arch.
  • Strengthening of the bridge over the Aubois Marseilles-lès-Aubigny (18) Cher Departmental Council Design and project management Masonry bridge without footways: general rehabilitation and widening with a reinforced concrete relieving slab.
  • Abnormal loads: load capacity of structures throughout France France entière DIR, SANEF, VINCI Autoroutes, departmental councils; hauliers Reassessment, load capacity check, crossing conditions Checks for category 3 convoys of up to 300 t, for road authorities and hauliers (ERTE, PREMAT, STEX, TES, SETREO…).
  • Review of the construction design of the Warcq bridge over SNCF tracks Warcq (08) Ardennes Departmental Council VISA Filler-beam bridge on piles crossing the Calais–Basel line, for the A304–RN43 link road.
  • Rehabilitation of the Pont de la République in Albi Albi (81) Conurbation of Albigeois DIA, AVP, PRO, ACT, VISA, DET, AOR Nine-arch brick structure within the UNESCO area: vegetation removal, pier strengthening, waterproofing, masonry regeneration.
  • Relocation of the A9 at Montpellier: review of noise barrier design Montpellier (34) VINCI Autoroutes Independent review of construction design More than 50,000 m² of noise barriers along 25 km of motorway: foundations, structures and stability checked.
  • Reassessment and strengthening of the Mâture bridge Cherbourg-en-Cotentin (50) Cherbourg naval base DIA, PRO, ACT Steel bridge at the naval base checked under military loads, after a full diagnosis of its corrosion protection.
  • Rehabilitation of the Lion d’Argent bridge over the Indre La Châtre (36) Indre Departmental Council DIA, AVP, PRO, ACT, VISA 19th-century ashlar bridge with insufficient capacity: a relieving slab on micropiles rather than reconstruction.
  • Riou Bourdou bridge: crossing of 110 t loads Savines-le-Lac (05) DIR Méditerranée Reassessment, risk analysis, crossing conditions Four-span prestressed box girder on the RN94, restricted to 70 t: feasibility of a 110 t crossing despite undersized hinge bars.
  • Paluel power station: transfer of feedwater heaters, civil engineering studies Paluel (76) EDF – AREVA, for Technifrance EXE Reassessment of the structures loaded by the transfer of two 126 t heaters, on rails then on a trailer.
  • Reassessment of the Thomas-Edison bridge in Lens Lens (62) City of Lens, for Gazonor Inspection, modelling, reassessment Highly skewed (66 grades) truss girder bridge over a former railway line converted into the Mining Basin cycle route.
  • Sioule viaduct (A89): crossing of wind turbine components Bromont-Lamothe (63) VINCI Autoroutes Load capacity check, crossing conditions Prestressed viaduct of nearly 1 km with 192.50 m spans, checked for about ten abnormal loads.
  • Reassessment of corrugated steel culvert batteries on the RD1 Viry-Noureuil (02) Aisne Departmental Council Reassessment, load tests Four batteries of corrugated steel culverts checked for abnormal loads, from the Sétra guide to finite element analysis.
  • Lalong viaduct (A89): abnormal loads Teilhède (63) VINCI Autoroutes, for STEX Load capacity check, crossing conditions Twin-girder composite structure with two decks of 50, 80 and 50 m: feasibility of crossings, eccentric crossing and crossing with traffic.
  • Diagnosis of a D-Day bridge at Pont-de-l’Arche Pont-de-l’Arche (27) Seine-Eure Conurbation Diagnosis, reassessment, strengthening studies A 1944 Mulberry floating bridge module, reused over the Eure: requalification for convoys, then coaches.
  • Load capacity of many masonry bridges Cher, Yonne, Ardèche, Orne, Aisne, Nièvre… Departmental councils, conurbations, municipalities Diagnosis, reassessment, load capacity Limit analysis of arch bridges: Arnon bridge at Culan, Vidalon bridge at Annonay, structures in the Yonne and Nièvre…
  • Railway noise barriers at Chelles and Vaires-sur-Marne Chelles et Vaires-sur-Marne (77) SNCF Réseau (formerly RFF), lead firm Systra Review of construction design, VISA Noise protection along the Noisy-le-Sec–Strasbourg line to eliminate noise black spots.
  • 60 m curved footbridge over the Oise Sempigny (60) Oise Departmental Council PRO, ACT, DET, VISA, OPC, AOR Curved footbridge with a 73.51 m radius alongside an existing bridge: two 1.10 m welded plate girders and a steel deck plate.
  • Rehabilitation of the Boran-sur-Oise suspension bridge Boran-sur-Oise (60) Oise Departmental Council DIA, AVP, PRO, ACT, VISA, DET, OPC, AOR 68.78 m suspension bridge restricted to 3.5 t: hangers, stirrups and footbridge replaced to raise the limit to 12 t.

No project matches these criteria.

Markers drawn as circles show an approximate location (municipality). Multi-site projects are not shown on the map.

Glossary of French design stages
DIA, DIAG
Diagnosis of the existing structure
EP
Preliminary studies
AVP
Outline design
PRO
Detailed design
DCE
Tender documents
ACT
Assistance with the award of works contracts
EXE
Construction design
VISA
Review of construction design
DET
Site supervision
OPC
Scheduling, management and coordination
AOR
Assistance with acceptance of works

THEOREMS, bridge engineeringTHEOREMS, bridge engineering

Designing differently…

Engineering consultancy for bridges, civil engineering and buildings.

Contact us

+33 (0)3 20 79 01 78

contact@theorems.fr

28, rue Pierre Curie
59000 Lille
France

Contact us Book a meeting

Latest projects

  • A28 motorway: detailed inspections and diagnosis for ALIS Autoroute A28, entre Rouen et Alençon
  • Abnormal load route in Lozère: 123 structures assessed Pied-de-Borne et Villefort (48)