As part of the redevelopment of the road through Marigny-Chémereau, the Vienne Departmental Council wished to rehabilitate the RD27A bridge over the Vonne and add a footpath. The structure has five semicircular masonry arches and a 5.17 m carriageway.
Investigations revealed lead in the parapet paint, unacceptable sulphate contents in the cantilevers and a carbonation front beyond the concrete cover. The chosen solution rehabilitates all the masonry and creates a relieving slab with a cantilever for a 1.40 m footway.
Characteristics
- Type: 5 semicircular arches (3.85 – 4.40 – 4.20 – 2.87 – 1.90 m)
- Cantilever concrete: C30/37, unacceptable sulphate contents
Works
- Repair of arch and pier masonry, regeneration grouting
- Demolition of concrete widenings, removal and patching of piers
- Relieving slab with cornices and parapets
- Waterproofing with prefabricated sheet and superstructures
- Strengthening of bed and bank protection
- Traffic light control