The concrete culvert has a 6.80 m opening and a 35.00 m long conduit. The height of cover fill is estimated at 1.50 m. The maximum clearance is 5.80 m.
Culvert on chemin de Vaudherland – Roissy-en-France (RD 902A)
Structure studied for an abnormal-load convoy of 158.81 tonnes.