All structures assessed

OA2 – PI 7 de Rompsay – Marans–La Rochelle canal (RN 137)

Structure studied for several abnormal-load convoys with a mass between 103.2 and 116.9 tonnes.

OA2 – PI 7 de Rompsay – Marans–La Rochelle canal (RN 137)

The structure is a prestressed ribbed-slab bridge (PSIDN).

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.