The metal culvert has a 4.70 m opening. The height of cover fill is about 0.5 m.
OH 003 (A83)
Structure studied for an abnormal-load convoy of 119.5 tonnes.
Structure studied for an abnormal-load convoy of 119.5 tonnes.
The metal culvert has a 4.70 m opening. The height of cover fill is about 0.5 m.