The prestressed-concrete slab bridge has 1 span of 18.17 m. The deck has a total width of 10.54 m and carries 1 traffic lane of 3.50 m in each direction.
Structure studied for several abnormal-load convoys with a mass between 72 and 103.82 tonnes.
The prestressed-concrete slab bridge has 1 span of 18.17 m. The deck has a total width of 10.54 m and carries 1 traffic lane of 3.50 m in each direction.