All structures assessed

Underpass – Saint-Antoine-de-Breuilh (RD 936, PR 65+125)

Structure studied for several abnormal-load convoys with a mass between 57 and 72 tonnes.

Underpass – Saint-Antoine-de-Breuilh (RD 936, PR 65+125)

The studied structure is a PICF (closed frame) with a 3.00 m square opening for a 3.50 m span. It has 2 walls and an invert 0.25 m thick, and a top slab 0.30 m thick.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.