The slab, fixed on sheet piles, has a single span of 10.80 m opening.
Road footbridge over the Mauldre – Épône
Structure studied for an abnormal-load convoy of 44 tonnes.
Structure studied for an abnormal-load convoy of 44 tonnes.
The slab, fixed on sheet piles, has a single span of 10.80 m opening.