All structures assessed

PH 349A (A19) – Courtenay interchange – Saint-Hilaire-les-Andrésis

Structure studied for an abnormal-load convoy of 132 tonnes.

PH 349A (A19) – Courtenay interchange – Saint-Hilaire-les-Andrésis

This structure is a PRAD (prestressed-girder overbridge) with 2 independent spans of 21.00 m and 19.20 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.