This structure is a PRAD (prestressed-girder overbridge) with 2 independent spans of 21.00 m and 19.20 m respectively.
Structure studied for an abnormal-load convoy of 132 tonnes.
This structure is a PRAD (prestressed-girder overbridge) with 2 independent spans of 21.00 m and 19.20 m respectively.