All structures assessed PI 1141 bis (A83) – Oulmes Structure studied for an abnormal-load convoy of 119.5 tonnes. It is a reinforced-concrete slab underpass with 1 skew span of 7.28 m. Bending moments in the deck under the convoy studied.