All structures assessed

PI 1222 (A72) – Andrézieux-Bouthéon (RD 498)

Structure studied for an abnormal-load convoy of 76.338 tonnes.

PI 1222 (A72) – Andrézieux-Bouthéon (RD 498)

The PIDP (prestressed-slab underpass) has 3 skew spans of 13.52 m, 22.31 m and 13.52 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.