All structures assessed

PI 1249 (A89) – Manoire and railway – Boulazac-Isle-Manoire

Structure studied for an abnormal-load convoy of 120 tonnes.

PI 1249 (A89) – Manoire and railway – Boulazac-Isle-Manoire

The A89 PI 1249 is an underpass with encased beams (PIPE) made of two adjoining decks, one of variable width. It has 4 spans of 10.90 m, 16.60 m, 16.60 m and 10.90 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.