All structures assessed

PI 1273-2.7 (A19) – Chevilly (D 2020)

Structure studied for an abnormal-load convoy of 120 tonnes.

PI 1273-2.7 (A19) – Chevilly (D 2020)

The PRAD (prestressed-girder overbridge) has 16 girders (8 per deck) over 1 skew span of 25.678 m. It has two decks of 12.24 m each for a loadable width of 10.12 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.