The structure is a PIPO (open portal frame) with 1 square opening of 8.50 m. The top slab and walls are 40 cm thick.
PI 1285-0.4 (A19) – Chevilly (RD 6)
Structure studied for an abnormal-load convoy of 120 tonnes.
Structure studied for an abnormal-load convoy of 120 tonnes.
The structure is a PIPO (open portal frame) with 1 square opening of 8.50 m. The top slab and walls are 40 cm thick.