The structure is a multi-girder reinforced-concrete bridge with the girders under the carriageway and 5 independent skew spans of 11.875 m, 3 x 27.27 m and 11.075 m respectively.
Structure studied for an abnormal-load convoy of 106.641 tonnes.
The structure is a multi-girder reinforced-concrete bridge with the girders under the carriageway and 5 independent skew spans of 11.875 m, 3 x 27.27 m and 11.075 m respectively.