The structure is a reinforced-concrete slab (PIDA) made of two decks. The deck concerned by this study (existing structure as shown on the general drawings) has 3 skew spans of 10.078 m, 11.335 m and 10.080 m respectively.
Structure studied for an abnormal-load convoy of 132 tonnes.
The structure is a reinforced-concrete slab (PIDA) made of two decks. The deck concerned by this study (existing structure as shown on the general drawings) has 3 skew spans of 10.078 m, 11.335 m and 10.080 m respectively.