All structures assessed

PI 4279 (A89) – Thiers (Dore river)

Structure studied for an abnormal-load convoy of 76.338 tonnes.

PI 4279 (A89) – Thiers (Dore river)

The VIPP (prestressed-girder bridge) has 3 identical independent spans of 3 x 29.80 m. It has two identical decks of 11.65 m total width each.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.