All structures assessed

PI 5266 bis (RN 10)

Structure studied for an abnormal-load convoy of 142.47 tonnes.

PI 5266 bis (RN 10)

The structure is a PIPO (open portal frame) with a 9.50 m opening and 2 decks. The walls and top slab are 45 cm thick.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.