All structures assessed

PI 5274 (A10) – Saint-André-de-Cubzac

Structure studied for several abnormal-load convoys with a mass between 115.36 and 119.98 tonnes.

PI 5274 (A10) – Saint-André-de-Cubzac

The structure is a PICF (closed frame) with a 10.00 m opening and carries 2 traffic directions. The walls and top slab are 40 cm thick, while the bottom slab is 45 cm thick.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.