All structures assessed

PI 5279 (A10) – Saint-André-de-Cubzac (SNCF Bordeaux–Nantes line)

Structure studied for several abnormal-load convoys with a mass between 115.36 and 119.98 tonnes.

PI 5279 (A10) – Saint-André-de-Cubzac (SNCF Bordeaux–Nantes line)

The structure is a PIDA (slab underpass) with an 11.18 m square opening and carries 2 traffic directions. The slab is 80 cm thick.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.