All structures assessed

PI 947 (A72) – Cleppe, Lignon river

Structure studied for an abnormal-load convoy of 76.338 tonnes.

PI 947 (A72) – Cleppe, Lignon river

The PIDP (prestressed-slab underpass) has 3 skew spans of 7.50 m, 14.50 m and 7.50 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.