All structures assessed

PIDP 1 (A83)

Structure studied for several abnormal-load convoys with a mass between 102.79 and 130.112 tonnes.

PIDP 1 (A83)

It is a prestressed-slab underpass with 3 square spans of 11.75 m, 14.93 m and 11.87 m respectively.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.