The structure is a steel structure topped with brick jack arches, 9.30 m long, with upstream and downstream widenings of 2.30 m and 8.20 m. The skew span is 4.20 m.
Upstream bridge over the Langlade canal – Saint-Martin-de-Crau (RN 568)
Structure studied for several abnormal-load convoys with a mass between 91 and 96 tonnes.