The structure is a road bridge of composite twin-girder type, with one skew span of 49.78 m.
Pont Ampère – Meaux (D 405A) over the railway
Structure studied for an abnormal-load convoy of 225.546 tonnes.
Structure studied for an abnormal-load convoy of 225.546 tonnes.
The structure is a road bridge of composite twin-girder type, with one skew span of 49.78 m.