The structure has two concrete arches topped with spandrel vaults supporting a reinforced-concrete deck. It has 1 span with a total length of 108 m.
Alby-sur-Chéran bridge (RD 1201)
Structure studied for an abnormal-load convoy of 177.2 tonnes.
Structure studied for an abnormal-load convoy of 177.2 tonnes.
The structure has two concrete arches topped with spandrel vaults supporting a reinforced-concrete deck. It has 1 span with a total length of 108 m.