All structures assessed

Alby-sur-Chéran bridge (RD 1201)

Structure studied for an abnormal-load convoy of 177.2 tonnes.

Alby-sur-Chéran bridge (RD 1201)

The structure has two concrete arches topped with spandrel vaults supporting a reinforced-concrete deck. It has 1 span with a total length of 108 m.