The metal culvert has a 2.654 m opening and a 33.623 m long conduit. The height of cover fill is estimated at 2.15 m. The rise is about 2.54 m.
Augé bridge (RD 6)
Structure studied for an abnormal-load convoy of 86.262 tonnes.
Structure studied for an abnormal-load convoy of 86.262 tonnes.
The metal culvert has a 2.654 m opening and a 33.623 m long conduit. The height of cover fill is estimated at 2.15 m. The rise is about 2.54 m.