The structure is a basket-handle masonry bridge of 2.902 m opening. The clearance is 1.57 m and the rise is about 1.10 m.
Cherves bridge (RD 650)
Structure studied for several abnormal-load convoys with a mass between 117.5 and 125 tonnes.
Structure studied for several abnormal-load convoys with a mass between 117.5 and 125 tonnes.
The structure is a basket-handle masonry bridge of 2.902 m opening. The clearance is 1.57 m and the rise is about 1.10 m.