The structure is a girder bridge with the girders under the carriageway and has two independent simply supported spans of 27.00 m. It is made of 10 I-girders connected at their ends by end cross-girders, supporting a 0.20 m thick slab.
Structure studied for an abnormal-load convoy of 119.45 tonnes.