All structures assessed

Abbaye bridge – Dompierre-sur-Besbre (RD 15)

Structure studied for several abnormal-load convoys with a mass between 72 and 103.82 tonnes.

Abbaye bridge – Dompierre-sur-Besbre (RD 15)

The reinforced-concrete girder bridge, with girders under the carriageway, has 1 span of about 26.00 m. The deck has a total width of 8.65 m and carries 2 traffic lanes (carriageway width 6.11 m).

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.