All structures assessed

Gaubardière bridge – crossing over railway lines

Structure studied for several abnormal-load convoys with a mass between 72 and 120 tonnes.

Gaubardière bridge – crossing over railway lines
Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.