It is a masonry bridge with three semicircular arches, i.e. 3 spans of 7.70 m opening each.
Gendarmerie bridge (RD 942)
Structure studied for several abnormal-load convoys with a mass between 123.73 and 138 tonnes.
Structure studied for several abnormal-load convoys with a mass between 123.73 and 138 tonnes.
It is a masonry bridge with three semicircular arches, i.e. 3 spans of 7.70 m opening each.