The Haie de Cadéac bridge is a composite twin-girder structure with regularly spaced cross-bracing and 2 spans of 23.50 m and 32.50 m respectively.
Structure studied for an abnormal-load convoy of 112.6 tonnes.
The Haie de Cadéac bridge is a composite twin-girder structure with regularly spaced cross-bracing and 2 spans of 23.50 m and 32.50 m respectively.