All structures assessed

RN 2537 bridge over the railway lines – La Rochelle

Structure studied for an abnormal-load convoy of 68.72 tonnes.

RN 2537 bridge over the railway lines – La Rochelle

The prestressed-concrete slab bridge has 4 continuous skew spans of 10.48 m, 15.81 m, 15.19 m and 11.51 m respectively. The overall width of the deck is 10.34 m.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.