The studied structure is a composite twin-girder bridge (regularly braced) with a single span of 49.87 m.
Structure studied for an abnormal-load convoy of 161.952 tonnes.
The studied structure is a composite twin-girder bridge (regularly braced) with a single span of 49.87 m.