The structure is a single-span bridge with steel girders under the carriageway, with a 27.50 m square span and a 28.70 m span.
Structure studied for several abnormal-load convoys with a mass between 147.5 and 158 tonnes.
The structure is a single-span bridge with steel girders under the carriageway, with a 27.50 m square span and a 28.70 m span.