All structures assessed

Vernière bridge – Diou (RD 779) over the Roudon

Structure studied for several abnormal-load convoys with a mass between 72.65 and 91.42 tonnes.

Vernière bridge – Diou (RD 779) over the Roudon

The PIDP (prestressed-slab underpass) has 1 span of 20.00 m. The deck has a total width of 9.60 m and carries 2 traffic lanes of 3.50 m in each direction.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.