The concrete culvert has a 4.30 m opening and a 30.00 m long conduit. The height of cover fill is estimated at 2.00 m. The maximum clearance is 2.80 m.
Larden bridge – Mézos (RD 38)
Structure studied for several abnormal-load convoys with a mass between 134 and 180.2 tonnes.