The structure is made of a basket-handle arch of 32.30 m opening.
Portel-des-Corbières bridge (RD 3)
Structure studied for an abnormal-load convoy of 291.5 tonnes.
Structure studied for an abnormal-load convoy of 291.5 tonnes.
The structure is made of a basket-handle arch of 32.30 m opening.