All structures assessed

Portel-des-Corbières bridge (RD 3)

Structure studied for an abnormal-load convoy of 291.5 tonnes.

Portel-des-Corbières bridge (RD 3)

The structure is made of a basket-handle arch of 32.30 m opening.