All structures assessed

Saint-Clément bridge (RD 137)

Structure studied for an abnormal-load convoy of 76 tonnes.

Saint-Clément bridge (RD 137)

The Saint-Clément bridge is a VIPP (prestressed-girder bridge) with 5 independent spans of 41.60 m each.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.