All structures assessed

Très-Cassès bridge – Castelsarrasin / Saint-Aignan (RD 12)

Structure studied for several abnormal-load convoys with a mass between 117.1 and 129.3 tonnes.

Très-Cassès bridge – Castelsarrasin / Saint-Aignan (RD 12)

The structure is a single-cell box girder, prestressed longitudinally.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.