All structures assessed

Bastides bridge (RD 906) – Saint-André-de-Capcèze

Structure studied for an abnormal-load convoy of 98.1 tonnes.

Bastides bridge (RD 906) – Saint-André-de-Capcèze

The structure is made of 2 different structures. The first is a metal culvert with a 1.40 m opening and a 33.00 m long conduit. The height of cover fill is estimated at 3.80 m. The maximum clearance is 1.40 m.