All structures assessed

Chemin de Charleval bridge – Forges-les-Eaux (RD 915)

Structure studied for an abnormal-load convoy of 155 tonnes.

Chemin de Charleval bridge – Forges-les-Eaux (RD 915)

It is a reinforced-concrete closed-frame bridge with a 4.00 m square opening and a 4.30 m square effective span.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.