It is a masonry bridge made of 7 semicircular vaults, with 7 spans of 6.50 m opening each.
Chet bridge (RD 941)
Structure studied for an abnormal-load convoy of 292 tonnes.
Structure studied for an abnormal-load convoy of 292 tonnes.
It is a masonry bridge made of 7 semicircular vaults, with 7 spans of 6.50 m opening each.