All structures assessed

Montadet bridge – Forges-les-Eaux (RD 915 over RD 9)

Structure studied for an abnormal-load convoy of 155 tonnes.

Montadet bridge – Forges-les-Eaux (RD 915 over RD 9)

It is a reinforced-concrete portal frame with an 8.00 m square opening and an 8.40 m square effective span.

Bending moments in the deck under the convoy studied
Bending moments in the deck under the convoy studied.