The structure is a PSIDA (slab overbridge) with 5 skew spans of 10.00 m, 3 x 17.00 m and 10.00 m respectively, for a total length of 72.40 m.
Structure studied for an abnormal-load convoy of 152 tonnes.
The structure is a PSIDA (slab overbridge) with 5 skew spans of 10.00 m, 3 x 17.00 m and 10.00 m respectively, for a total length of 72.40 m.