The structure is made of 3 arches of 21.25 m opening each.
Saint-Gobain bridge over the Arc – Modane
Structure studied for an abnormal-load convoy of 62.528 tonnes.
Structure studied for an abnormal-load convoy of 62.528 tonnes.
The structure is made of 3 arches of 21.25 m opening each.