The studied structure is a precast prestressed-concrete girder bridge (VIPP). It has 5 spans of 38.80 m. Each span has 3 precast girders braced at the supports. The slab, 10.62 m wide, is prestressed transversely. The deck has a usable width of 11.00 m. It carries 2 traffic lanes on a current carriageway width of about 7.00 m.