The girder bridge has 3 independent (simply supported) spans of 3 x 15.33 m. It has a deck of 8.40 m width between parapets.
Structure studied for an abnormal-load convoy of 126.484 tonnes.
The girder bridge has 3 independent (simply supported) spans of 3 x 15.33 m. It has a deck of 8.40 m width between parapets.