This structure is a reinforced-concrete girder bridge with 1 skew span of 19.30 m for a total length of 26.50 m.
Structure studied for several abnormal-load convoys with a mass between 111.82 and 119.94 tonnes.
This structure is a reinforced-concrete girder bridge with 1 skew span of 19.30 m for a total length of 26.50 m.